What You Are Actually Buying
Integration engagements come apart at scoping far more often than at execution. The build usually works. What goes wrong is that the business bought hands when it needed judgment, or judgment when it needed hands, and nobody established which before the contract was signed.
Be specific internally before going to market. Are you buying a decision about how systems should exchange data, or construction of connections you have already specified? Are you buying a one-time project or an ongoing capability? Will your team maintain the result, and does the firm know that? Those answers determine which kind of firm fits, and they are cheaper to establish in a meeting than in a post-mortem.
The Three Kinds of Firm
Staffing-led. You get engineers, often skilled ones, who build to your specification. This works well when you have internal architecture capability and need capacity. It works badly when you expected the engineers to decide the approach, because that is not what you contracted for and they will reasonably build what you asked for.
Platform implementation partners. Certified in one vendor technology, frequently compensated through that relationship, and genuinely expert in it. The right choice when the platform decision is already made and correct. The risk is that the assessment phase, if there is one, is unlikely to conclude that a different platform or no platform suits you better.
Independent advisory. Defines the approach, specifies the patterns, and sets the sequence. Some build as well, some hand the specification to your team or to a build partner. The value is in the decisions. The risk is paying for a document if the engagement is not scoped to produce something actionable.
None of these is superior. The error is assuming the category from the marketing, since all three use similar language about outcomes and partnership.
Know which kind of firm you need before you shortlist. Stratiform Group is explicit about which of those three it is, where build work sits, and what you hold at handover.
Questions That Separate Them Quickly
Six questions will do more sorting than any capability matrix, and all six are specific to integration work rather than consulting generally.
- What share of your revenue comes from one technology vendor?
- Walk us through an engagement where discovery changed the scope. What changed, and who absorbed the cost?
- When a source system renames a field, what happens to the connections you built for us?
- Who holds the credentials, the documentation, and the monitoring after handover?
- Which of our systems do you expect to be hardest to work with, and what makes you say that?
- How many hours a week will you need from our people, and from which roles?
The second question carries the most signal. Every discovery phase surfaces something unexpected, so a firm with no story about scope changing has either not run many or does not discuss them. The last question is the one most often answered optimistically, and it is the one that sinks schedules.
What a Serious Proposal Contains
A proposal worth comparing describes the work, not the outcome. Outcome language is easy to write and impossible to evaluate.
Look for a named discovery phase with its own deliverable, so the scope of the build is set by what discovery finds rather than by what was guessed beforehand. Look for explicit assumptions, since every integration estimate rests on assumptions about source system access, data quality, and availability of your people. A proposal with no assumptions section has them anyway, just unwritten.
Look for what you will hold afterward: documentation, a connection register, monitoring, and runbooks. Look for how change is handled, because the brief will change. And look for who specifically will do the work, not how many people are in the firm.
Red Flags
- A fixed scope and fixed timeline proposed before anyone has examined your systems
- No discovery phase, or a discovery phase that cannot conclude the project should change shape
- An architecture recommended before the requirements conversation happened
- No mention of what happens after go-live, or ownership handled as an afterthought
- Case studies with outcome figures and no description of the starting position
- Reluctance to name the individuals who will be on the engagement
The first is the most common and the most costly. Firm numbers before discovery are either padded heavily or will be revised, and in both cases the number you compared against was not real.
Comparing Proposals That Are Not Comparable
Three firms will scope the same brief three different ways, which makes side-by-side comparison misleading unless you normalize first.
Write your own list of what has to be true at the end: which systems exchange what data, at what frequency, with what monitoring, documented how, maintained by whom. Then read each proposal against your list and note what it does not cover. The gaps are more informative than the inclusions, because every firm leads with its strengths and few are explicit about exclusions.
Where a proposal is substantially cheaper, find the scope difference before concluding it is better value. In integration work the usual difference is documentation, monitoring, and error handling, all of which are invisible at go-live and expensive at month nine.
not real.
Engagement Shapes
Discovery-only engagements with a fixed scope suit businesses that need the approach settled and have build capacity. They produce a specification and a sequence, and they let you take the build to market separately with a brief that is actually specific.
Build engagements make sense once the approach is decided. Insisting on a fixed price for one before discovery is how both sides end up unhappy.
Ongoing arrangements suit businesses that keep adding systems and do not want to re-procure each time. Worth being clear whether you are buying capacity or availability, as those behave differently when something breaks.
Who Should Be in the Room
Integration decisions get made by technical teams and paid for by finance, and the gap between those two conversations produces most of the misalignment.
The people who should be present: whoever owns the reported figures that depend on the data, whoever will maintain the result, and whoever can say which business decisions the integration is meant to improve. That last person is frequently missing, which is how projects deliver working connections that change nothing anyone notices.
If the engagement touches an acquisition, bring whoever owns the post-acquisition integration plan, because the sequencing constraints are different and they are usually tighter.
Scope the Work Before You Compare the Proposals
The decision that determines whether an integration engagement succeeds is made before any firm is contacted. It is the decision about what the work has to achieve, who maintains it, and which questions discovery needs to answer.
Stratiform helps leadership teams define that scope and evaluate what comes back, including the parts of a proposal that are easiest to overlook.
Normalize the proposals before you read the numbers. A structured review establishes what the engagement has to deliver and what a serious response should contain.